Kitchen Design
C o u n t r y W i l d f l o w e r
Country Wildflower draws from the essence of the Forget Me Not wildflower creating a bright, light, inviting space that all can enjoy.
The imagery of the countryside's lush rolling hills scattered with trees, long flats of open space, and quaint dirt roads lined with beautiful country flowers helped bring the concept to life. A modern farmhouse style with natural materials and blue hues reflects the forget-me-not flower inspiration and the countryside where they grow.
Goal: This project aims to create a kitchen that adheres to NKBA standards and addresses client layout desires and aesthetic preferences.
Skills: AutoCAD, NKBA standards, programming, concept development, schematic design, space planning, design development, construction documents, specification sheets, and material estimating and costing